Sunday, November 21, 2010

I305 and Cheetah Hunt Updates

Intimidator 305:

From redfoot12 at KDFansite:

So it looks like Robb Alvey from TPR spoke with Sandor Kernacs from Intamin at IAAPA. He posted the following:

"Sandor tells me there will be some changes in i305, and I'm not allowed to mention what I was told, but let me tell you the locals will not be disappointed!!!"


Hmmm... so something big is possibly happening with I305!!

Hopefully this is an overbanked turn addition, and the removal of the trims. =D

Cheetah Hunt:

So recently vertical construction has finally begun on Cheetah Hunt. Here's some links to RCPro's recent updates:

http://www.rcprocommunity.com/showthread.php?2421-RCPro-Busch-Gardens-Tampa-Update-Mega-Thread!-New-update-11-20-10&p=39543&viewfull=1#post39543

http://www.rollercoasterpro.com/updates/bgt11.19.10/

http://www.rollercoasterpro.com/updates/bgt11.15.10/

Here's an Orlando United update:

http://www.orlandounited.com/?p=547

And a JohnnyUpsideDown update:

http://www.johnnyupsidedown.com/cheetahunt4.html

So the final brake run, transfer track, and station track is now up. Can't wait till they start on the launch tower! =D

Speaking of which, BGT posted an update behind the construction walls, where they describe the launch tower as the "Windcatcher Tower." Could this be the name of the launch tower??

It seems pretty cool! =D Can't wait!

Friday, November 19, 2010

More On Hersheypark 2012

From Screamscape:

2012 - Attraction 2012 - (11/19/10) Screamscape sources tell us that the station for the 2012 coaster will indeed take over the current Tilt-A-Whirl site, with the ride’s queue taking over the site of the nearby bathroom in Comet Hollow. While we don’t know the entire layout, our source says to expect to see it go down past the Comet’s entrance and follow the creek up to the existing dam area by the picnic pavilion near the Comet’s turnaround.


I wonder if construction has already started... I remember hearing that construction for Diamondback started in October 2007, with a 2009 opening. While I don't think this is as big as Diamondback, I'm pretty sure this coaster's construction will start pretty soon.

Wednesday, November 17, 2010

Hersheypark 2012 Rumor

From deathbydinn at ThemeParkReview:

Just something I noticed, in the IAAPA video that was recently posted the person Robb interviewed from Maurer said that they were in discussions for something in America that they can't talk about until April and since Hershey is announcing it next spring..perhaps they're working with Maurer on something?


So Maurer could make this? Hmmm... well after the problems with Rockit at Universal, I'm not sure if this is possible... but I would LOVE for that to happen (but who knows, maybe it could be for Kentucky Kingdom's promised 2012 coaster). Coasterfreak101 at ThemeParkReview made a cool idea for one too:

There's nothing saying that Maurer can't use those new four-across X-car trains and make themselves a good hyper.


In case you don't know, these are the 4-across X-Car trains:

http://www.maurer-rides.com/x-train/



In the middle of the train, there is floor, but in the outer train, there is NO FLOOR (which makes it like a Wing-Rider)!!! =O

Okay, this I hope is true (despite Rockit's problems). So I hope for either the following:

A B&M Dive Machine.
A B&M Wing Rider (X Raptor).
A B&M Flyer.
A Maurer "Hyper."
An Intamin Mega Lite.

So many possiblities... =D

Kentucky Kingdom News

Recently, Ed Hart promised a new coaster for a revived Kentucky Kingdom:

The Kentucky State Fair Board will be asked next month to consider a $50 million bond issue to help upgrade and reopen the Kentucky Kingdom amusement park next to the Kentucky Exposition Center.

Developer Ed Hart, who was designated in May by the fair board as the park's preferred operator, said his proposal calls for park revenue to pay off the bonds over the next 20-plus years, covering an annual debt of about $3million.

He said the park's reopening is dependent on a public-private partnership. He described the state's contribution as an investment in a community facility worth about $200million.

Among Hart's plans are spending $20million to add a major ride and to double the size of the water park.

“My goal is to see Kentucky Kingdom flourish again, and it can. It will pay for itself,” said Hart, who headed a group that owned Kentucky Kingdom from 1988-97. He sold the park in 1997, for about $80million, to Six Flags, which closed it early this year.

Six Flags has filed for bankruptcy in Delaware. The court is expected soon to approve agreements with the fair board under which Six Flags would end its obligations for the park.

In an interview earlier this week, Hart said he will submit a business plan and a proposed lease for operating the park when the fair board meets in October.

Fair board president Harold Workman said the bond issue and the investment in the park make sense, but would require General Assembly approval in 2011.

He noted that a new state-funded economic impact study found that the return on the investment would be “pretty significant, a little better than I thought it might be.”

The $50,000 study done by the AECOM consulting firm and paid for by the fair board and the Kentucky Tourism, Arts & Heritage Cabinet, found that revenue from a reopened Kentucky Kingdom would be around $11million and include more than $1million in annual lease payments from Hart, new tax revenue and money taken in by hotels and restaurants near the fairgrounds.

The study said the park's reopening would eventually create about 1,200 jobs, primarily hospitality positions and some construction employment.

Hart said he is proposing that the state spend $8million of the bond money to add a “marquee” roller coaster. (The park plans to keep six existing coasters.)

Another $12million would go to expand Hurricane Bay water park, which was renamed Splashwater Kingdom, doubling its size and adding 16 water slides along with four new water towers. Other improvements would include a wave lagoon and a quarter-mile adventure river.

Hart's proposal calls for most of the rest of the bond money to cover upgrades of park infrastructure.

Both Hart and Workman said the goal is to have the park reopened by Memorial Day 2011.

Hart pledged the reopened park will have free parking, other good deals such as free use of inner tubes, and $1 for all drinks. He said the cost of admission and season passes would be “very competitive” with other regional theme parks.

He projected that the park would draw at least 1 million paid visitors in its first full year. Some of that gain would be achieved by sharply increasing advertising in regional cities, such as Cincinnati and Nashville, Hart said.

He is proposing an initial annual lease payment to the fair board of around $1.2million. The lease would let Hart rent about 50 acres at the expo center for theme park facilities, with nearly all of the land outside of Ring Road.

The proposed lease also would permit Kentucky Kingdom to use about 20 now-vacant acres for parking in the old Ashton Adair neighborhood owned by the fair board. A new park entrance would be developed off Phillips Lane, west of Gate 1.

Hart said the business plan will call for him to set aside a “significant sum” every year — a figure he declined to disclose — for investing in new rides and other park improvements.

Chad Carlton, Mayor Jerry Abramson's spokesman, said the theme park would be a major job creator and have a positive impact on the region's economy. “We very much would like to see (the park) reopened as soon as is practical.”

Hart already has paid $3million to the fair board, which under a deal between the board and Six Flags, used $2.35million to give to Six Flags to acquire about 20 acres of amusement park land that Six Flags owns outside the road circling the exposition center. The rest of the $3million will go for maintenance, security and other costs. The state deal with Six Flags is subject to expected bankruptcy court approval.


However, it seems that it will not open until 2012:

Kentucky Kingdom will not be open next summer, as originally hoped, but instead will aim for a 2012 reopening.

The delay is tied to the need to get the General Assembly’s approval of bonds that would be issued to finance improvements at the amusement park, which was abruptly abandoned by the Six Flags system earlier this year, in proper order.

The State Fair Board intends to recommend that the 2011 legislature, which convenes in January, authorize the sale of an estimated $50 million tax-exempt bond issue to pay for the upgrades, including at least two major new attractions and an expanded water park.

The state would have little financial risk with the bonds and Harold Workman, fair board president, said, “Every public official we have met with supports the park’s reopening” at the Kentucky Exposition Center.

The bond debt, likely to be around $3 million a year for 20 or more years, would be retired out of revenue generated by Kentucky Kingdom, which will be operated by the Kentucky Kingdom Redevelopment Co. headed by investor Ed Hart.

Hart had been scheduled to present a preliminary business plan for the revamped park’s operation to the fair board at a meeting Thursday. But the fair board postponed the presentation and gave Hart until March 31 to refine the plan, to negotiate a lease for the park and to give the legislature time to consider the bonds. The fair board owns about 60 acres where the park will operate.

Hart declined to comment beyond a news release issued jointly with the fair board after the agency’s meeting.

Hart said recently that he had at least a preliminary business plan ready for the fair board’s consideration. Hart said in the prepared statement that “we share in the disappointment that the park will not be ready to open next spring.…We will certainly do our best to bring Kentucky Kingdom back as soon as is reasonably possible.”

Workman told the board that all signs point to the park’s resumption of full operation in 2012.

He said in an interview that the board initially held out hope to have the park open perhaps as early as summer 2011, because it hadn’t ruled out financing the park’s improvements through conventional lending sources. But he said prevailing commercial interest rates are prohibitive to large borrowing.

He also acknowledged that the fair board approached the city about issuing tax-exempt bonds for the park’s makeover but that city officials indicated that they felt they already had a “full plate.” In addition, the park is on state, not city, property.

Hart said in the statement that keeping an interim agreement with the fair board in place for as long as five more months will give him time to fix more precisely the costs of repair and replacement of the park rides, buildings, equipment and infrastructure.

“Kentucky Kingdom is like a small city. It takes time to prepare it for opening,” Hart said in the statement.

Hart previously operated Kentucky Kingdom throughout most of the 1990s and sold the park to Six Flags for about $80 million in 1997.

In an interview, Workman said federal bankruptcy court in Delaware has approved all the transactions between the fair board and Six Flags, which is in bankruptcy proceedings. The approvals give the fair board clear title to all the remnants of Kentucky Kingdom. The board has agreed, for now, to share the ownership of the rides and property with Hart to provide collateral for $3 million that he has paid the fair board.

The board used $2.35 million of the payment was given to Six Flags so the fair board would acquire about 20 acres of amusement park land that the company owned outside the road circling the exposition center. The rest of the money is going for maintenance, security and other costs.

Hart’s preliminary business plan predicts that the park would draw at least 1 million paid visitors in its first full year, with Hart intending to promote the park across the region. He has proposed an annual lease payment to the fair board of around $1.2 million.

Hart intends to develop a new entrance into Kentucky Kingdom off Phillips Lane and to offer free parking rather than have patrons pay $8 to park at the fairgrounds.

The business plan calls for spending $20.3 million of the $50 million from the proposed bond issue for new attractions, including about $8 million for a new roller coaster. The rest of the budget calls for: $9.3 million to repair existing rides; $3.8 million for site work and water park expansion; $2.4 million for new buildings; $2.1 million for repair and relocation of existing rides; $2.1 million to replace existing equipment; $2.3 million for a new parking lot off Phillips Lane; $2.4 million for repair of existing buildings; and most of the rest for contractors, demolition, contingencies, landscaping and signs.

A recent state-funded study found that economic impact of a reopened Kentucky Kingdom could be about $11 million a year, including tax revenue and money taken in by hotels and restaurants near the fairgrounds.

Workman said he is confident that the park’s economic benefits “will make a strong case for funding, when we approach the legislature in January.”

“We have made great progress” since Six Flags walked away from its long-term lease early this year, Workman said.

“A lot of issues have been worked out, and the board is committed to reopening Kentucky Kingdom. But there is still a lot of work to do,” said fair board chairman Ron Carmicle.


Link

Now, something very nice is coming out of this. From Screamscape:

Park News - (11/17/10) A few new videos (five I think) have been added to the Kentucky Kingdom YouTube page, where they answer a few more questions about rides and the project’s status. One question addresses the intended new use of the 10 acres used for the old entrance (for bigger/taller rides!), as well as questions about Chang, Quake and Twisted Twins. Oh… and Chang’s replacement is promised to be an “equal if not better than Chang”. The old Chang site will however be used to expand the waterpark.
Twisted Twins, which may have it’s name changed back to Double Trouble perhaps (the intended name Ed Hart had for it) will undergo a $3 million refurbishment and reprofile, as well as have brand new trains purchased for it.
(11/15/10) According to the official Kentucky Kingdom facebook page, the new park operators do plan on restoring and reopening the Twisted Twins wooden coaster. In a public response to a question about that coaster, the official answer was, “At this point, our plan calls to completely renovate it and re-open the dual wooden coasters!”
(11/13/10) Kentucky Kingdom has launched an all new website at KentuckyKingdom.com. While there isn’t much to see, perhaps the most interesting thing is that they have put a picture of a Maurer X-Car coaster right on the front page. A hint about the park’s intended new coaster project perhaps?


So with the replacement of Chang said to be better than it... hmmm? And rumor has it, they may reprofile Twisted Twins and rename it Double Trouble. That's great news! =D

I'm still waiting to see what this new coaster may be...

Sunday, November 14, 2010

Cedar Point 2012

Well, with WindSeeker going up at Cedar Point for 2011, it makes us coaster geeks wonder what is coming 2012. It has been 3 years since Cedar Point's last new coaster (I remember thinking there would be a coaster for 2010, but instead it was Shoot the Rapids, and last summer, I was thinking there would be a 2011 coaster, but instead it was WindSeeker), with Maverick being the last one in 2007. For a huge coaster park like Cedar Point, that is pretty frustrating (not that the other additions were stupid, they look fun. Just saying...). 2012 seems like an appropriate window not only because of how long they have gone without a new coaster, but Six Flags Magic Mountain (in a previous blog post) has took the coaster crown from Cedar Point, by adding Little Flash and Green Lantern.

So 2012 seems like the correct time for a new coaster, but what will it be? I remember reading rumors of an Intamin prototype last summer for next year (but again, it was WindSeeker). I wonder if that rumor is still alive, and if it will come in 2012 (things like a new prototype from a coaster manufacturer take time). I've also read rumors back in 2009 (for the 2010 season) there could be a GCI Wooden Coaster like the one CGA was supposed to get (in 2009) in 2010, which seems like another possibility for 2012.

And another question is where it will go up? Recently, Ocean Motion has been confirmed to move to the old Demon Drop site to make room for WindSeeker. But some rumors are spreading that it will be for one year (though I half doubt it, half wonder). If they were to remove Ocean Motion right before the 2011 season ends, they could reuse that space as a queue for a new coaster (with the station further in the parking lot behind it), and they could tear out that parking lot for the coaster, as well as some of the beach behind Disaster Transport. The coaster can even go over Disaster Transport itself, and wrap around the Space Spiral observation tower, and include a 500 ft. tower after the first launch (by Space Spiral).

Another possibility is Chaos. Recently there have been rumors that this may be Chaos's last season (the ride was up for sale for a year). While it's location is by no means big enough for a coaster, it could become the station area, with a launch over the pathway by Space Spiral, as well as right by the tower itself, and possibly a 500 ft tower (not Kingda Ka/TTD type, but a huge airtime hill) into the portion of the parking lot I mentioned in the other idea (including some of the beach behind Disaster Transport and over Disaster Transport, but this time around, they go with some airtime hills over the pathway by Space Spiral and over Disaster Transport's entrance.

Now say the Demon Drop area is the site for a new coaster for 2012 (if it were to happen), I can foresee this scenario in construction:

As of now, Ocean Motion has been confirmed to move to the old Demon Drop site for 2011, so if it were to be removed soon, it would not be in the beginning of 2011. With the parking lot behind it involved with this coaster (my idea that is), I can see the parking lot torn out sometime this off-season, and land clearing and footer work occurring throughout the 2011 season. Near the end of the season, once they announce the coaster, Ocean Motion closes for good, and they start work on the queue.

This is all just speculation, keep that in mind. I just think the 2012 season seems like an appropriate time for a new coaster.

Six Flags Magic Mountain has 18 COASTERS!

I forgot to mention this, but as of last month, it looks like Cedar Point is no longer the "coaster capital of the world," as Six Flags Magic Mountain has announced that in 2011, they will be adding 2 NEW COASTERS as well as a Superman renovation (bringing the coaster count to 18), as part of Six Flags' 50th anniversary. So let me split things up:

Superman: Escape From Krypton

This is the long-rumored revamp of Superman: The Escape. As rumored, the cars will be running backwards up the tower, which will be repainted (BTW, it seems work has begun on repainting it). The top half of the tower will be painted red, and the bottom half (as well as the station track) will be blue, with the railings on both parts being yellow. This looks like fun... and thank god they didn't turn it into Bizarro (Scream deserves it more)!

Green Lantern:

Remember those "Project: 18" rumors. Guess this is the result: America's first Intamin ZacSpin coaster. And boy, is Six Flags in love with Green Lantern or what (first Great Adventure, now Magic Mountain)? XD In case you don't know what a ZacSpin is, here is an example:

http://www.rcdb.com/4309.htm?p=24897

This coaster is Insane at Gröna Lund in Sweden. That looks like fun (and thankfully, SFMM isn't the only park to get a ZacSpin in America in the near future, as rumor has it, Orlando Thrill Park might build one with the park)! =D

Little Flash:

Originally for installation in 2010 as "Mr. Six's DanceCoaster," this is a relocated kiddie coaster from the now-defunct Six Flags New Orleans. It was originally going to go up by Deja Vu, with site prep already going on, but it turns out it will go up near Bug's Bunny World. When the 3-coaster experience was announced, it was going to be called "Kid's Coaster" (which I thought was a silly name, even for a kiddie coaster), but the name was changed to "Little Flash."

Now for the schedule, at least according to Six Flags' Q3 Report.

Superman: Escape From Krypton will complete its transformation and open in Spring Break 2011.

Little Flash will open early May 2011.

Green Lantern will open by Memorial Weekend 2011.

And here are some pics from Screamscape:



1. Superman: Escape From Krypton



2. Green Lantern



3. Little Flash and Others





4. Green Lantern Logo



5. Superman: Escape From Krypton construction pic from Sidra at ThemeParkReview.

Sounds like 2011 is an exciting year for Six Flags Magic Mountain (and the other Six Flags parks as well, other than Six Flags America, Mexico, and Great Escape who are getting NOTHING!). =D

Too bad they won't be ready by the time I go this Winter... =(

Saturday, November 13, 2010

Park Updates #6

Orlando Thrill Park:

From Screamscape:

Central Florida News - (11/13/10) One of our readers who got a closer look at the plans for the Orlando Thrill Park identified a few more rides for us. One was an Intamin Mega-Splash, very much like Perilous Plunge at Knott’s Berry Farm, another was a Chance Revolution flat ride and the most exciting was a Vekoma Stingray coaster, an ultra compact Flyer design with a vertical lift hill. One of the slides also clearly shows off the classic layout of a Vekoma “SLC” Inverted coaster, like The Hangman at Wild Adventuers. (...)
(11/12/10) Some new artwork for the proposed Orlando Thrill Park was shown off to local residents this week, and you can find some pictures of it posted here. Included are some overhead layout drawings of the proposed coasters, but I’m not sure if you can gleem too much information from these. Perhaps the most reveling clues were some of the text shots that described one of the coasters as a ‘Motobike Launch Coaster / 55 ft height” and the monster 425 ft coaster is listed as “Inverted Accelerator Coaster / 425 ft height”. That note right there may give you shivers… as an Inverted version of Kingda Ka or Top Thrill Dragster could be a real treat. Anyone go to this meeting and snap some better shots of the map for themselves?


Okay, the time I hear that an inverted Intamin Strata is coming to Florida is when I start drooling over this... oh, how I hope this is true! =D

And here is the link to the artwork:

http://www.wftv.com/slideshow/news/25759223/detail.html

According to the artwork it seems to include the following (from quotes):

1. "Ride 1 Inverted Accelerator Coaster 425 ft height" (world's first Intamin Inverted Strata)
2. "Ride 5 Motorbike Launch Coaster 55 ft height" (Vekoma Motorbike)
3. "Ride 3 ZacSpin Coaster 82 ft height" (Intamin ZacSpin, 2nd in America)
4. "Ride 7 Stingray Flying Coaster 106 ft height" (Vekoma Stingray)
5. "Ride 8 Drop Tower 312 ft height" (*manufacturer guess unknown* Drop Tower)
6. "Ride ? Revolution 74 ft height" (Chance Revolution)
7. "Ride 4 Mega Splash 121 ft height" (Intamin Mega Splash)
8. Vekoma SLC

There are also some unknown rides, possibly some kind of hyper coaster made by B&M or Intamin (oh please let this be true!! =D) and another Intamin Blitz coaster (Maverick, Cheetah Hunt).

Sounds good to me! =D

Busch Gardens Tampa:

Track has yet to go up, but a plethora of footers have been poured in the first trench/first launch/second launch area, with the bridge (that goes over it) frame taking shape. There is also work going on inside the old Clydesdale Hamlet, which will become home to Cheetah Run. As for the construction in the middle, it seems that land clearing has expanded from the second trench to the third trench (which recently got metal frames). In the upper portion, footers have also been poured in the old wet portion of Rhino Rally. Also, according to BGTNation's latest update, it seems that vertical construction will start NEXT WEEK. I'm just wondering why vertical construction hasn't started now.

In any case, I'm VERY excited!

Gardaland:

More track has gone up for X Raptor, featuring a third inversion:

http://www.theparks.it/gardaland-p1/notizie/2010/11/ufficializzata-la-terza-inversione-per-x-raptor-n875/

It seems to be an inline twist. Sounds like this ride is going to be pretty intense.