Thursday, September 30, 2010

Cheetaka News

It seems like three things have happened in the past week:

1. Yellow support beams have arrived on site with the green track on Tuesday.
2. Construction walls have expanded to the area next to Caravan Crossing on Monday (here is a pic of the area from BGTGuide back when they were doing surveying in January: http://www.bgtguide.com/bgt/images/stories/4.jpg). This is supposedly the area where the rumored figure-8 launch tower will go up.
3. Another teaser has been posted by BGT showing the launch tower (with the first trench). It goes in the first trench and goes under a highly-themed arch (where the first launch will be). It then goes through the second launch (or booster?) and into the tower, which goes through a figure-8. It then enters the second trench.

This looks like on heck of a development. I can't wait for the announcement! =D